C2511 Beal Homes CGI 1

PDR to build Beal Homes new HQ

PDR will be returning to the Bridgehead Development Park in Hessle for its latest contract win having constructed over 110, 000 sq ft of Grade A offices at Bridgehead over the last 7 years.  

The 1.5 acre site adjacent to the Porsche Centre delivered by PDR in 2020, will see the creation of a two storey Head Quarters for Beal Homes, designed with a double height glazed façade with feature vertical fins.  

Configured around a central atrium the ground floor incorporates open plan and cellular offices, board room, training and conference facilities with a dedicated kitchen, welfare facilities, customer service area and a visitors’ showroom. 

The first floor provides further cellular offices sited around the perimeter with a centralised open plan office. A large staff room and break out area spills out onto an outdoor terrace and garden with a feature canopy partly covering the external seating areas to assist with shading in the summer months. 

Public and private car parking areas for 70 vehicles will be provided with a separate entrance into the building for the public to enhance the customer experience. 

C2511 Beal Homes Montage

Share this story!

Leave us a Comment