




As part of the overall Lime Square Openshaw development, PDR also built a Medical Centre and a Gymnasium on the site.
Key details
Project duration
16 weeks (Medical Centre)
29 weeks (Gymnasium)
Client
Dransfield Properties
Contract type
JCT Design & Build
Architect
Dixon Dawson
Structural Engineer
JNP Group