SGS European Headquarters, Bridgehead

SGS chose Bridgehead near Hull as their European Headquarters and selected PDR to design and build the project.

The 20,000 sq/ft two storey office was constructed with clear spans for maximum internal flexibility.

External materials, curtain walling/render/rain screen was selected to ensure the elevations were both in keeping with the other PDR built buildings on the site and showcased the SGS flagship Building.

Key details

Building size

20,000 sq/ft

Project duration

28 Weeks

Client

Wykeland Group Ltd

Contract type

JCT 2011 Design and Build

Architect

The Harris Partnership

Structural Engineer

Alan Wood & Partners